Bathroom renovation - NW3
Bathroom renovation NW3
Full bathroom renovation across the NW3 postcode — Hampstead & Belsize Park, London. Strip out, replumbing, tiling, suite installation and Part P electrical works from a single team. Fixed quote, no subcontractors.

Bathroom renovation in NW3
What the project covers
Properties in the NW3 postcode — Prestigious North West London postcode. Large Victorian and Edwardian detached houses. High-end maintenance and compliance market. Our team has worked across this postcode and understands the typical drainage configurations, joist layouts and building management requirements.
A full renovation covers the complete sequence: strip out of the existing suite and tiles, first fix replumbing of supply and waste connections, tiling with proper waterproofing in all wet zones, suite installation and final second fix plumbing, electrical works within bathroom zones, and finishing with silicone seals and accessories.
All electrical works within bathroom zones — including extractor fans, heated towel rails, shaver sockets and heated mirrors — are carried out by our Part P registered electricians. Every installation is certificated and notified to the local authority. You receive the electrical installation certificate as part of the project handover pack.
Wet rooms in upper-floor flats require particular care. Full waterproof tanking of all walls and the floor must be completed and allowed to cure before tiling begins. Drain position relative to the floor joists is determined at the design stage, not after the floor has been opened. We carry out this survey as part of the pre-works consultation to avoid programme delays during the project.
For leasehold properties in NW3, notification to the building management company is required before any works that affect shared drainage stacks or building structure. We provide guidance on this as part of the pre-works process and can supply the required method statements for managing agents if needed.
Full scope of works
Everything included in a bathroom renovation
Plumbing and wet works
- Strip out of existing suite, tiles and floor
- Replumb waste and supply connections
- Bath, shower tray, WC and basin installation
- Waste pipe sizing and gradient compliance
- Tanking membrane to all wet zones
- Cement backer board substrate for tiling
- Full wall and floor tiling
- Silicone sealing and grout finishing
Electrical works (Part P)
- Extractor fan with timer or humidity sensor
- Heated towel rail connection
- Shaver socket (outside Zone 1)
- Illuminated or demisting mirror
- Electric underfloor heating mat and thermostat
- Downlighter installation (IP65 rated for Zone 2)
- Part P notification to local authority
- Electrical installation certificate on completion
What we do
Bathroom renovation services
Full Bathroom Renovation
Complete strip out, replumbing of waste and supply connections, suite installation, tiling and finishing. We manage the full project from first fix through to final silicone seal.
Wet Room Installation
Full tanking of all walls and floor with a waterproof membrane system, linear or central drain positioned to suit floor joists, and full ceramic or porcelain tiling throughout.
Shower Room Installation
Space-saving shower rooms for London flats and terraces. Walk-in enclosures, fixed glass screens or tiled wet areas. Ideal where removing the bath gains a utility room or wardrobe.
Bathroom Suite Supply and Fit
Supply and fit of WC, basin, bath or shower tray from trade suppliers. We advise on suite selection to suit your space, pipework layout and budget before ordering.
Tiling and Waterproofing
Full wall and floor tiling including tanking, backer board, adhesive, grout and silicone seal. Large format tiles, metro tiles and mosaics all handled by our in-house tiling team.
Bathroom Electrical Works
Part P registered electrical installation including extractor fans, heated towel rails, shaver sockets and illuminated mirrors. All work within bathroom zones is certified and notified.
180+ verified reviews
Trusted by London homeowners and landlords
60 reviews
Checkatrade.com
120 reviews
MyBuilder.com
Common questions
Bathroom renovation NW3: frequently asked
How long does a bathroom renovation take in London?
A standard bathroom renovation in London typically takes 1 to 2 weeks from strip out to final finish. Wet rooms may take slightly longer due to the required drying time for the waterproof membrane before tiling can begin. For tenanted properties, factor in that the property will be without a bathroom during this period — we recommend coordinating the work between tenancies where possible.
How much does a bathroom renovation cost in London?
Bathroom renovation costs in London vary by scope and finish. A basic refresh with a new suite and tiling typically costs between 3,000 and 5,000 pounds. A mid-range full renovation including replumbing, tiling and electrical works runs from 5,000 to 8,000 pounds. A premium wet room or luxury finish with underfloor heating and high-end materials can reach 8,000 to 15,000 pounds or more. We provide a fixed quote after a site visit.
Do I need planning permission to renovate my bathroom in London?
Planning permission is generally not required for an internal bathroom renovation. However, listed buildings and properties in conservation areas — both common across London — may require consent for any new external vent openings. If your property is a leasehold flat, you should notify your building management company before works begin. Our team can advise on any consents relevant to your specific property.
Can you renovate a bathroom in a tenanted property?
Yes. We regularly carry out bathroom renovations in tenanted London properties. Coordination with tenants is essential — the property will be without a working bathroom during the works. We provide clear daily progress updates and aim to minimise disruption. For landlords, we can also issue all relevant certificates including Part P notification on completion.