Plumbing — London
Bathroom plumbing in London
Shower installation, bath replacement, toilet repair and basin fitting across all London boroughs. Gas Safe registered plumbers for all bathroom plumbing work.
Services
Bathroom plumbing services in London
Shower installation London
Electric shower, mixer shower and power shower installation. Includes new pipework and waste connections where required.
Bath replacement London
Steel, acrylic and cast iron bath replacement. Includes removal of old bath and waste connections.
Toilet repair and replacement
Cistern repair, toilet replacement, concealed cistern installation and soil pipe connections.
Basin and sink fitting
Pedestal, wall-hung and vanity unit basin installation. Includes waste and supply connections.
Shower enclosure and tray
Shower tray replacement and riser rail installation. Waterproof membrane installation.
Bathroom radiator replacement
Towel rail and panel radiator replacement. Valve upgrade and balancing.
Common questions
Bathroom plumbing London: frequently asked
What bathroom plumbing work do you carry out in London?
Prestige Engineers carry out: shower installation (electric, mixer, power shower), bath replacement and installation, toilet repair and replacement, basin and sink fitting, shower tray replacement, radiator replacement in bathrooms, and concealed cistern installation. We cover all London boroughs.
Do I need building regulations approval for bathroom plumbing in London?
Like-for-like bathroom replacements (same appliance, same location) do not require building regulations approval in most cases. However, moving soil pipes, adding a new WC or bathroom where one did not exist, or installing an unvented hot water cylinder requires building regulations approval. Our engineers advise on what notifications are required before starting work.
How long does a bathroom plumbing job take in London?
Typical timeframes: toilet replacement 2–3 hours; shower installation 3–6 hours (depending on type and existing connections); bath replacement 4–8 hours; full bathroom strip-out and refurbishment (plumbing works only) 1–2 days. Tiling and carpentry are additional trades.